Construction of buildings and structures of Tyumen trunk pipeline directorate

Description of the project

2015-03-01
Client Transneft Siberia, JSC
Location Tyumen
Direction Oil and Gas Industry Facilities
Term 9 months (01.06.2014 – 01.03.2015)
Total Area 9000 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next