Construction of buildings and structures of Surgut trunk pipeline directorate

Description of the project

2015-09-30
Client Transneft Siberia, JSC
Location Surgut
Direction Oil and Gas Industry Facilities
Term 7 months (01.02.2015 – 30.09.2015)
Total Area 6000 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next