| Client | Transneft Siberia, JSC |
| Location | Tobolsk |
| Direction | Oil and Gas Industry Facilities |
| Term | 12 months (01.05.2014 – 01.05.2015) |
| Total Area | 9200 sq.m. |
| Status | General Contractor |
Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation