Construction of buildings and structures of Tobolsk trunk pipeline directorate

Description of the project

2015-05-01
Client Transneft Siberia, JSC
Location Tobolsk
Direction Oil and Gas Industry Facilities
Term 12 months (01.05.2014 – 01.05.2015)
Total Area 9200 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next