Construction of a fire engine house at Aprelskaya pipeline service station, Surgut Trunk pipeline directorate

Description of the project

2014-11-01
Client Transneft Siberia, JSC
Location Surgut
Direction Oil and Gas Industry Facilities
Term 5 months (30.06.2014 – 01.11.2014)
Total Area 3800 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next