Reconstruction of buildings and structures on Tobolsk Trunk Pipeline Directorate

Description of the project

2015-07-20
Client Transneft Siberia, JSC
Location Tobolsk
Direction Oil and Gas Industry Facilities
Term 5 months (01.02.2015 – 20.07.2015)
Total Area 4000 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next