| Client | Transneft Siberia, JSC |
| Location | Urai |
| Direction | Oil and Gas Industry Facilities |
| Term | 5 months (10.03.2016 – 10.08.2016) |
| Total Area | 5000 sq.m. |
| Status | General Contractor |
Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation