Client | Transneft Siberia, JSC |
Location | Urai |
Direction | Oil and Gas Industry Facilities |
Term | 5 months (10.03.2016 – 10.08.2016) |
Total Area | 5000 sq.m. |
Status | General Contractor |
Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation