Construction of the administrative and residential complex of Transneft-Siberia JSC

Description of the project

2015-11-10
Client Transneft Siberia, JSC
Location Tyumen
Direction Oil and Gas Industry Facilities
Term 4 months (20.07.2015 – 10.11.2015)
Total Area 2800 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next