Construction of the buildings Specialized Department for the Prevention and Emergency Response (SUPLAV), base of production-technical services

Description of the project

2015-12-01
Client Transneft Siberia, JSC
Location Tyumen
Direction Oil and Gas Industry Facilities
Term 6 months (30.06.2015 – 01.12.2015)
Total Area 3500 sq.m.
Status General Contractor

Civil works, electrical works, low-voltage systems installation, water supply, sewage, HVAC, fire-fighting systems installation

back
next